Plus d’un million de livres, à portée de main !
Bookbot

Rainer Kolisch

    Project scheduling under resource constraints
    Make to order assembly management
    Make-to-Order Assembly Management
    • Make-to-Order Assembly Management

      • 276pages
      • 10 heures de lecture

      The book delves into the intricacies of multi-level make-to-order manufacturing systems, focusing on resource allocation, operation sequencing, and timing for specific machines and workers. It assumes pre-established facility designs, including layout and capacity for key departments: engineering, fabrication, and assembly. The engineering department plays a crucial role in creating and customizing products, generating essential documentation like blueprints, and its capacity is influenced by the number and skills of engineers, as well as the availability of tools like CAD systems.

      Make-to-Order Assembly Management
    • Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma chine, and the assignment of start and finish times to operations.

      Make to order assembly management
    • Inhaltsverzeichnis1: Introduction.2: Description of the Problems.3: Classification of Schedules.4: Characterisation and Generation of Instances.5: The Single-Mode Project Scheduling Problem.6: The Multi-Mode Project Scheduling Problem.7: Project Scheduling with Given Deadline.8: Project Scheduling with Setup Times.9: Applications to Production Management.10: Concluding Remarks.List of Notations.List of Abbreviations.References.

      Project scheduling under resource constraints